Complete Restoration of the Old Naval Hospital

Photographs - November 19, 2010

Click on photo to see a larger image.

First Floor

First Floor--On site restoration of the transom windows - November 19, 2010First Floor--On site restoration of the transom windows

First Floor--Installation of the west staircase - November 19, 2010First Floor--Installation of the west staircase

First Floor--Encapsulating plaster complete in the east corridor (ready for skim coat) - November 19, 2010First Floor--Encapsulating plaster complete in the east corridor (ready for skim coat)

Second Floor

Second Floor--Installation of the west staircase - November 19, 2010Second Floor--Installation of the west staircase

Second Floor--Lifting the parts for the east staircase into the building (through the west side corridor window) - November 19, 2010Second Floor--Lifting the parts for the east staircase into the building (through the west side corridor window)

Second Floor--Lifting the parts for the east staircase into the building (through the west side corridor window) - November 19, 2010Second Floor--Lifting the parts for the east staircase into the building (through the west side corridor window)

Second Floor--Lifting the parts for the east staircase into the building (through the west side corridor window) - November 19, 2010Second Floor--Lifting the parts for the east staircase into the building (through the west side corridor window)

Second Floor--Metal materials ready for installation of the east stairwell (east rooms) - November 19, 2010Second Floor--Metal materials ready for installation of the east stairwell (east rooms)

Elevation

Elevation--Detail of the preparation for mortar repointing (First Floor south just west of main door) - November 19, 2010Elevation--Detail of the preparation for mortar repointing (First Floor south just west of main door)

Elevation--East wall repointing preparation--lower level nearly complete, upper level not done - November 19, 2010Elevation--East wall repointing preparation--lower level nearly complete, upper level not done

Miscellaneous

Miscellaneous--Lifting the parts for the east staircase into the building - November 19, 2010Miscellaneous--Lifting the parts for the east staircase into the building

Miscellaneous--Lifting the parts for the east staircase into the building - November 19, 2010Miscellaneous--Lifting the parts for the east staircase into the building

Miscellaneous--Lifting the parts for the east staircase into the building - November 19, 2010Miscellaneous--Lifting the parts for the east staircase into the building

Miscellaneous--Lifting the parts for the east staircase into the building - November 19, 2010Miscellaneous--Lifting the parts for the east staircase into the building

Miscellaneous--Lifting the parts for the east staircase into the building - November 19, 2010Miscellaneous--Lifting the parts for the east staircase into the building

Miscellaneous--Lifting the parts for the east staircase into the building - November 19, 2010Miscellaneous--Lifting the parts for the east staircase into the building