Link to Home Page


Complete Restoration of the Old Naval Hospital

Photographs - December 2, 2010

Click on photo to see a larger image.

Ground Floor (Basement)

Ground Floor (Basement) - New room with west stairway - December 2, 2010Ground Floor (Basement) - New room with west stairway

Ground Floor (Basement) - West stairway - December 2, 2010Ground Floor (Basement) - West stairway

Ground Floor (Basement) - Bathroom under construction in room just east of north door - December 2, 2010Ground Floor (Basement) - Bathroom under construction in room just east of north door

Ground Floor (Basement) - East Stairway under construction - December 2, 2010Ground Floor (Basement) - East Stairway under construction

First Floor

First Floor - Bathroom under construction just east of north door - December 2, 2010First Floor - Bathroom under construction just east of north door

First Floor - Corridor looking to east - December 2, 2010First Floor - Corridor looking to east

First Floor - Corridor looking west (with electrical box) - December 2, 2010First Floor - Corridor looking west (with electrical box)

First Floor - Central east room on south side being  prepared for brown (encapsulating) coat - December 2, 2010First Floor - Central east room on south side being prepared for brown (encapsulating) coat

First Floor--Central east room on south side being  prepared for brown (encapsulating) coat (note east stairway under construction). - December 2, 2010First Floor--Central east room on south side being prepared for brown (encapsulating) coat (note east stairway under construction).

First Floor--Looking north in main corridor - December 2, 2010First Floor--Looking north in main corridor

Second Floor

Second Floor--Construction of east stairway - December 2, 2010Second Floor--Construction of east stairway

Second Floor--Looking south from stairwell - December 2, 2010Second Floor--Looking south from stairwell

Second Floor--Northeast room.  Preparation for brown (encapsulating) coat - December 2, 2010Second Floor--Northeast room. Preparation for brown (encapsulating) coat

Second Floor--View east in corridor - December 2, 2010Second Floor--View east in corridor

Second Floor--Wall construction around west stairwell - December 2, 2010Second Floor--Wall construction around west stairwell

Third Floor

Third Floor--Looking down east stairwell as beam is being raised into place - December 2, 2010Third Floor--Looking down east stairwell as beam is being raised into place

Third Floor--Looking down east stairwell as beam is being raised into place - December 2, 2010Third Floor--Looking down east stairwell as beam is being raised into place

Third Floor--Looking west in main corridor - December 2, 2010Third Floor--Looking west in main corridor

Third Floor--Top of west stairwell - December 2, 2010Third Floor--Top of west stairwell

Elevations

Elevation--Detail of south elevation just west of main door, showing preparation for repointing mortar - December 2, 2010Elevation--Detail of south elevation just west of main door, showing preparation for repointing mortar

Elevation--Detail of south elevation just west of main door, showing preparation for repointing mortar - December 2, 2010Elevation--Detail of south elevation just west of main door, showing preparation for repointing mortar

Elevation--West side showing restoration of third floor windows in progress - December 2, 2010Elevation--West side showing restoration of third floor windows in progress

Elevation--West side, first floor, detail of restored window frames before priming - December 2, 2010Elevation--West side, first floor, detail of restored window frames before priming

Elevation--West side, first floor, detail of restored window frames before priming - December 2, 2010Elevation--West side, first floor, detail of restored window frames before priming

Elevation--West side, first floor, detail of restored window frames before priming - December 2, 2010Elevation--West side, first floor, detail of restored window frames before priming

Elevation--Detail of west side corner in preparation for repointing - December 2, 2010Elevation--Detail of west side corner in preparation for repointing

Elevation--Ground floor window on east side detail after restoration and priming - December 2, 2010Elevation--Ground floor window on east side detail after restoration and priming

This site is sponsored by the Friends of the Old Naval Hospital

Last updated January 29, 2011