Grounds--Electrical and geothermal lines (covered) into building next to west side or north entrance
Miscellaneous--Artifacts from the Old Naval Hospital including roof piece and fence parts
Ground Floor (Basement) - West staircase installation
Ground Floor (Basement) - West staircase installation
Ground Floor (Basement) - West central room with wiring
Ground Floor (Basement) - Old boiler room north east side
Ground Floor (Basement) - Plumbing in restroom
First Floor--Final skim coat for plaster in south east corner
First Floor--Final skim coat for plaster in south east corner
First Floor--Final skim coat for plaster in south east corner (north side)
First Floor--Mastic preparation for attaching nylon netting before final skim coat
First Floor--Encapsulation coat in north east room
First Floor--northwest corner of corridor--placement of electrical box
First Floor--West staircase installation
First Floor--Mastic preparation for attaching nylon netting before final skim coat
First Floor--Lathing preparation for base plaster coat
First Floor--South east corner room--the various levels of plastering
First Floor--South east corner room--the various levels of plastering
First Floor--South east corner room--the various levels of plastering
First Floor--South east corner room--Structural crack in the brick just below window
First Floor--Looking east in corridor
Second Floor--Northeast room--Preparing for plastering (green outlines to be removed, the rest just skimmed)
Second Floor--Southeast room--Preparing for plastering (green outlines to be removed, the rest just skimmed)
Second Floor--West staircase installation
Second Floor--Restroom plumbing
Third Floor--West staircase installation (looking down)
Third Floor--West staircase installation (looking down)
Third Floor--West staircase installation (looking down)
Elevation--South side just west of main door, showing mortar preparation
Elevation--South side just west of main door, showing mortar preparation work
Elevation--South east corner just after paint removal
Elevation--East side just after paint removal
Elevation--North east side just after paint removal
Elevation--North side just after paint removal
Elevation--North side just after paint removal
Elevation--South side just after paint removal
Elevation--South east corner after paint removal
Elevation--East side after paint removal. Worker preparing mortar joints for repointing
Elevation--East side after paint removal. Worker preparing mortar joints for repointing
Elevation--South side after paint removal.
Geothermal/HVAV--Vault man hole
Geothermal/HVAC--Looking down manhole into vault at eight collection lines serving 32 wells (with water in the square)