Ground Floor (Basement)--Incoming electrical system boxes - December 30, 2010
Ground Floor (Basement)--Incoming electrical system boxes - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Second Floor--Lifting and delivering heavy (55 lbs. per foot) beams (and columns) for second floor large central room - December 30, 2010
Roof--Delivering the metal air conditioning base to the third floor - December 30, 2010
Elevation--West side brick pointing - December 30, 2010
Elevation--West side brick pointing - December 30, 2010
Elevation--West side brick pointing - December 30, 2010
Elevation--West side brick pointing - December 30, 2010